A barndominium kit is only one part of a completed home. Before ordering a metal building package, align the parcel, zoning, permit path, plans, engineering, contractor, complete budget, appraisal approach and construction-financing process.
A clock has 12 hours, and a successful barndominium project has 12 critical planning steps. Before it is time to order a building package, work through the complete project: property, permits, engineering, contractor, budget, appraisal and financing.

Start with the finished home you intend to build, not simply the shell you found online. Establish the approximate size of the living area, garage or workshop, porches, bedrooms, bathrooms, mechanical space, RV bays and any future expansion.
The lender, architect, engineer, manufacturer and contractor should be working from the same vision. When each party is solving for a different building, the project eventually collides with its budget, engineering or permit requirements.
Do not evaluate the land separately from the home. Before buying a parcel—or designing around land you already own—confirm whether the site can physically support the intended residence.
A seemingly inexpensive parcel can become an expensive build site once utility extensions, septic engineering, drainage, access improvements and grading are included. For construction planning, the lot and completed residence need to work as one project.
Owning land does not automatically mean you can build the structure you want. Contact the city, town or county governing the parcel before committing to a kit or deposit, and describe the project in practical terms: a permitted residential dwelling using an engineered metal or post-frame system, with any attached garage, shop or storage area.
Do not rely on a neighboring structure as proof of approval. It may have been grandfathered, permitted under an earlier code or approved through a different process. Final direction comes from the authority having jurisdiction over the actual parcel.
The permit path should come before the purchase order. Ask the building department what it requires for the building, foundation, electrical, plumbing, mechanical, septic and residential components of the project.
The practical question is not simply whether a building model meets a general code. It is whether the entire proposed residence meets every currently adopted requirement for this specific parcel.
The building must be designed for how it will actually be used. The design team should understand living-quarter placement, interior walls, windows and doors, garage-door sizes, ceiling heights, roof loads, mechanical penetrations, plumbing, electrical needs, insulation, fire separation and future equipment loads.
An engineered shell is not automatically a complete residential plan package. Architectural, foundation, mechanical, electrical, plumbing, energy and interior plans may still be required. Frame lines, bracing and structural openings cannot be treated as an afterthought.
Engineered metal buildings work as a system: the frame, roof, secondary framing, openings and bracing respond together to structural loads. Once the building is engineered, manufactured and erected, changes may require new calculations, replacement components, reinforcement or a partial redesign.
If a future porch, lean-to, RV bay, shop extension, mezzanine or larger living area may matter, discuss it before the building is ordered. Much of the design flexibility ends once the structural system is manufactured.
A manufacturer’s stamped building drawings do not necessarily include the foundation. The shell engineer and foundation engineer need to coordinate the exact building dimensions, structural reactions, soil conditions, anchor locations, slab requirements and local site conditions.

Ordering a shell before the foundation engineer and contractor review the design can create expensive coordination problems. The dimensions, connection points, loads and site conditions must match.
A barndominium frequently involves a residential designer, manufacturer, building engineer, foundation engineer, site-work contractor, concrete contractor, erector, licensed general contractor, trades, appraiser, insurer and construction lender. The manufacturer may provide only the shell; the erector may provide no residential work; and the general contractor may exclude site work, utilities or foundation.
Before financing begins, determine who is contractually responsible for every part of the completed, permitted and insurable residence. A lender needs a complete path from land to finished home, not unrelated estimates with missing scopes.
The advertised price of a building kit is not the cost of a completed barndominium. A complete budget may include land, survey, design, engineering, testing, permits, grading, utilities, well or septic, foundation, delivery, erection, exterior openings, insulation, interior framing and finishes, trades, driveway, landscaping, insurance and contingency.
Concrete, labor, plumbing, electrical work, HVAC, kitchens, bathrooms, finishes, site development and professional services do not disappear because the exterior structure is metal. Account for the home you intend to occupy—not only the shell you hope to erect.
Construction financing considers the completed property, not just the kit cost. The appraisal typically needs complete plans, elevations, specifications, square-footage allocation, bedroom and bathroom count, finish level, site improvements, contractor budget and comparable sales.
Barndominiums can be more challenging when there are few comparable residential properties or a large share of the building is allocated to shop, garage or special-purpose use. Cost and value are not automatically the same, so begin the appraisal conversation before deposits or prepaid purchases limit your ability to adjust the design.
A manufacturer may require an initial deposit and a substantial balance before delivery. Construction lenders commonly release funds through controlled draws tied to documented work, inspections, approved budgets, title updates and invoices. Those two processes do not always align automatically.
Before signing a building contract, ensure the manufacturer, builder, borrower and lender understand how funds will move.
Once plans, permits, contractors, appraisal, financing and payment schedules are aligned, construction can begin. Follow approved plans, document material changes, obtain approval before changing the budget, coordinate inspections with draws, preserve invoices and lien releases, track the contingency and keep the project team informed.
The goal is not simply to erect a metal shell. The goal is a permitted, insurable and appraisable residence that can be completed under the approved construction plan.
A Tucson-area owner once assumed that a neighboring metal building proved a similar height would be allowed on his parcel. He ordered the building before confirming the current local standard. The neighboring structure had been permitted under an earlier rule, and the new project was rejected at the proposed height.
A manufactured building cannot necessarily be shortened or reworked as easily as jobsite lumber. Solving the permit problem after ordering can leave an owner with an engineered product that cannot be erected as planned.

Bring together the parcel, preliminary plans, manufacturer proposal, project-team information, complete budget, payment schedule, timeline and available cash before a construction-financing review. This article is educational only; consult the applicable building authority and appropriately licensed professionals before purchasing land, ordering materials or beginning construction.
Matt Siket
Mortgage Loan Originator, NMLS #442558 · Liberty Federal Credit Union, NMLS #518136
Last reviewed: August 2026
Related Specialty Page
Barndominium Financing
A planning review is the best way to get a direct answer for your specific situation. It is not a loan application — just a conversation.
Review My Barndominium PlanEligibility requirements apply. All loans subject to credit approval.